Phase 01 Migration and Cutover Plan

Strategy

Perform architecture rebuild with reset/reseed as the official path.

Steps

  1. Finalize schema migration scripts.
  2. Run local reset/reseed rehearsal.
  3. Run staging reset/reseed rehearsal.
  4. Execute integrity verification suite.
  5. Lock schema contracts and produce baseline snapshot.

Verification Script Requirements

  • count checks for canonical entities
  • FK integrity checks
  • expected stage graph checks
  • expected project intake state checks

Example Verification Queries

-- orphan project stage states
SELECT COUNT(*)
FROM "ProjectStageState" pss
LEFT JOIN "Project" p ON p.id = pss."projectId"
LEFT JOIN "Stage" s ON s.id = pss."stageId"
LEFT JOIN "Track" t ON t.id = pss."trackId"
WHERE p.id IS NULL OR s.id IS NULL OR t.id IS NULL;

-- project intake state coverage
SELECT COUNT(DISTINCT p.id) AS projects_without_intake
FROM "Project" p
LEFT JOIN "ProjectStageState" pss
  ON pss."projectId" = p.id
LEFT JOIN "Stage" s
  ON s.id = pss."stageId"
WHERE s."stageType" = 'INTAKE'
  AND pss.id IS NULL;

Cutover Readiness Artifacts Produced in Phase 01

  • schema migration files
  • seed scripts
  • integrity query scripts
  • reset/reseed execution logs