MOPC-App/docs/round-redesign-architecture.../mixed-round-design-implemen.../phase-07-validation-release/runbook.md

1.0 KiB

Release Runbook (Atomic Cutover)

Preconditions

  • all prior phase gates complete
  • signed release checklist
  • rollback owner and communication owner assigned

Cutover Sequence

  1. freeze non-release writes and announce maintenance window
  2. execute final backup snapshot
  3. deploy release candidate build
  4. run reset/reseed as planned for production state model
  5. run post-deploy integrity and smoke checks
  6. run mandatory critical-path E2E subset
  7. publish completion and monitor

Immediate Post-Cutover Checks

  • auth and role gating paths
  • transition mutation sanity
  • assignment preview/execute path
  • live cursor operations
  • audience vote acceptance and dedupe
  • reporting endpoint correctness

Rollback Trigger Conditions

  • integrity check failures
  • critical mutation path failure
  • unacceptable error-rate spike

Rollback Plan (High Level)

  • restore backup snapshot
  • redeploy previous stable build
  • validate critical-path smoke tests
  • issue incident communication and postmortem schedule