MOPC-App/docs/round-redesign-architecture.../mixed-round-design-implemen.../phase-03-admin-control-plan.../overview.md

24 lines
621 B
Markdown

# Phase 03 Overview: Admin Control-Plane UX
## Objective
Deliver a wizard-first admin control plane that exposes full required configuration in create-time flow, with a safe advanced editor for power users.
## In Scope
- setup wizard IA and behavior
- advanced stage and routing editor
- simulation and validation panel
- create/edit parity
## Out of Scope
- visual redesign
- participant-facing workflows
## Exit Criteria
1. Full required setup possible from create flow.
2. No hidden edit-only required fields.
3. Validation and simulation guardrails implemented.
4. Phase gates complete.