Bundles the prior autonomous-session output that was sitting unstaged:
- Em-dash sweep across src/ + tests/ (en-dash/em-dash to hyphen, ~2280 instances)
- country-flag-icons rollout (CountryFlag component, replaces emoji glyphs that
never rendered on Windows; lazy-loads the 3x2 SVG index as a single chunk
after the per-subpath dynamic-import approach silently failed in webpack)
- Admin IA Phase 1+2: 7-domain regroup, 41 to 38 pages, /admin/berths index,
redirects (ocr to ai, reports to dashboard, invitations to users),
docs/admin-ia-proposal.md
- Per-template email tester (registry + endpoint + UI on Email admin page)
- Cancel-document mode picker (delete-from-Documenso vs keep-for-audit)
- Dashboard PDF report: 25 widgets, SVG charts, date-range picker, 11 resolvers
- Customize-widgets per-region sortables at xl+ (charts/rails/feed); single
flat sortable below xl when the layout stacks; per-viewport saved orders
- Audit doc updates capturing each shipped item
- Lint fixes: react-compiler immutability in DonutChart (reduce instead of
let-reassign), set-state-in-effect disables in CountryFlag and
UploadForSigning preview-bytes effect, unused 'confirm' destructures in
interest contract + reservation tabs, unescaped apostrophe in test-template
card copy
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>