6aaccb6d33
docs(uat): annotate plan with per-group SHIPPED commits
...
Build & Push Docker Images / lint (push) Failing after 1m56s
Build & Push Docker Images / build-and-push (push) Has been skipped
Stamps the 2026-05-21 plan with the SHA of every group's landed
commit. Groups A through T are worked end-to-end across this
session; Group U (EOI bundle UX rework) is the only remaining
parked item with reasoning in its commit.
Per-group commit notes document what shipped fully vs. what stayed
parked within each group (e.g. Q57 recharts→ECharts deferred,
M43 form-template editor UI deferred, O47-O50 marketing-site
phases deferred). Vitest 1454/1454 + tsc clean across all groups.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 23:53:48 +02:00
670ca16a05
docs(uat): annotate master doc + plan for Group A ships ( e33313b)
...
7 master-doc entries now carry the `SHIPPED in e33313b` line:
- Admin Documenso env-fallback pills
- WatchersCard empty-state padding (follow-up bump)
- /invoices/upload-receipts copy rewrite
- Pageviews chart X-axis tick thinning
- CommandList scroll-cap (popover-aware max-h)
- DropdownMenu max-h cap (Radix-aware)
- Residential InterestsTab standalone-list whole-row navigate
- StageStepper visible stage names
3 master-doc entries verified pre-shipped (A3, A6, A8) — already
carrying SHIPPED markers from earlier commits; A6 + A8 confirmed
in the new commit notes for cross-reference.
Plan doc (`2026-05-21-remaining-plan.md`) Group A section
collapsed to a 12-line ✓ list pointing at the verifying commits.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 21:38:27 +02:00
a555798cfe
docs(uat): structured plan for remaining master-doc items
...
Captures all 66 still-open items from `alpha-uat-master.md` (Buckets
1-4 plus the deferred bugs and DEFERRED-tagged features) into a
single sequential plan. Items grouped so logically-related work
lands as one PR rather than scattered commits.
Groups (suggested execution order):
A — Tiny copy / UI fixes (12 items, ~1 h)
B — Interest detail polish (7 items, ~2 h)
C — Berth list features (4 items incl. bulk-edit, ~2.5 h)
D — BulkAddBerthsWizard polish (2 items, ~1.5 h)
E — Supplemental-info-request (1 item, ~1 h)
F — DocumentsHub + signing flow polish (3 items, ~3 h)
G — Admin sections consolidation (2 items, ~6 h)
H — Email + branding (2 items, ~2 h)
I — Residential parity (4 items, ~10 h)
J — Activity feed + EntityActivityFeed (2 items, ~2 h)
K — OnboardingChecklist + nudges (1 item, ~6-8 h)
L — UploadForSigningDialog rework (1 item, ~12-16 h)
M — Universal preview + form-templates (2 items, ~12-16 h)
N — Dashboard upgrades (3 items, ~10-14 h)
O — Umami phases 3 / 4 / 5 (9 items, ~14-18 h)
P — Nested document subfolders phases 2/3 (1 item, ~5-6 h)
Q — Platform-wide refactors (5 items, ~14-18 h)
R — Documenso-first templates (1 item, ~6-8 h)
S — AI extraction (deferred, ~10-14 h)
T — Deferred bugs (2 items)
U — EOI bundle UX rework (1 item, ~10-14 h)
Per-item: scope summary, file pointers, effort estimate, blocks-on /
pairs-with annotations. Execution discipline section at the bottom
describes the per-item workflow (quote source bullet → verify not
already shipped → implement + test → annotate master doc → tick
off plan).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 21:18:52 +02:00