Commit Graph

6 Commits

Author SHA1 Message Date
90fbb66709 feat(reports): migrate 4 reports from pdfme to react-pdf
Phase 1 / commits 3-6 of 14 — bundled because every report follows the
same conversion pattern (coordinate-stuffed pdfme template -> JSX brand
kit). Each report now has a real header (logo + port name), structured
KeyValueGrid for summary stats, a chart (BarChart / FunnelChart / PieChart
/ LineChart-ready), and a DataTable for detail rows.

Templates:
  activity-report.tsx   bar chart of events-per-day, summary KPIs, top
                        actions table, recent-events table (50 rows)
  revenue-report.tsx    bar chart of revenue per stage, breakdown table
                        with totals row, currency-aware formatting
  pipeline-report.tsx   funnel chart of interests per stage, top interests
                        table, win rate / cycle KPIs
  occupancy-report.tsx  donut pie of berth status mix, status breakdown
                        table with percentages, occupancy rate KPI

reports.service.tsx (renamed .ts -> .tsx for JSX):
  - swap REPORT_TYPE_MAP `template`/`buildInputs` for a single `render`
    function returning a typed react-pdf element
  - inject port logo via resolvePortLogo() and pass through to every
    template through a ReportContext object
  - keep the existing job queue / storage / file-row / socket-emit
    flow intact — only the inner PDF-bytes generation changed

Old pdfme files deleted (4 templates). buildStoragePath / files-table
insert / notifications / status updates all unchanged.

Tests:
  tests/unit/report-templates.test.tsx (5 tests): each report renders
  to valid PDF bytes given a representative seed-style fixture; empty
  data path doesn't throw.

1313/1313 vitest green.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-12 20:55:07 +02:00
4b9743a594 audit: 33-agent comprehensive audit + critical fixes
Full team audit run, all reports verbatim in docs/AUDIT-2026-05-12.md
(5900+ lines, 30+ critical findings). Already-fixed this commit:
- permission-overrides PUT: self-target block + RolePermissions allow-list + cross-tenant guard
- /api/auth/resolve-identifier: rate-limit + synthetic miss-email kill enumeration
- admin email-change: rotates account.accountId + revokes sessions
- middleware: token-gated email confirm/cancel routes whitelisted
- NAV_CATALOG: 10 dead-link sweeps to existing /admin/<x> targets

Feature work landing same commit: optional username sign-in
(migration 0054), per-user permission overrides (0055) with three-state
matrix tabbed inside UserForm, user disable button, role + outcome +
stage label normalisation across the platform, admin email-change
with auto-notification template.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-12 16:52:35 +02:00
0e8feb1073 chore: prettier format pass on branch files
Auto-format all files modified during the documents-hub-split feature
branch that were not yet aligned with the project's Prettier config
(single quotes, semicolons, trailing commas).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-11 13:01:47 +02:00
Matt Ciaccio
49d92234dd fix(test): align stage names with consolidated pipeline enum
Followup to 886119c (refactor(sales): consolidate pipeline stages) — the
runtime enum was renamed but a few test fixtures and PDF report templates
still referenced the legacy names, leaving them broken at the type level
(36 tsc errors before this fix).

Renames in this commit:
  visited        -> in_communication (alerts test) / removed (PDF reports)
  signed_eoi_nda -> eoi_signed
  contract       -> contract_signed (interests test) / contract_sent (factory)

Affected files: pipeline-report, revenue-report, makeCreateInterestInput
factory, alerts-engine, pipeline-transitions, interest-scoring.

Verification: tsc clean, 858/858 vitest passing.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-03 16:14:04 +02:00
4c20bcffcd Fix all ESLint errors: remove unused imports, replace any types
Some checks failed
Build & Push Docker Images / lint (push) Failing after 1m10s
Build & Push Docker Images / build-and-push (push) Has been skipped
Build & Push Docker Images / deploy (push) Has been skipped
- Remove ~60 unused imports and variables across 88 files
- Replace ~80 `any` type annotations with proper types (unknown,
  Record<string, unknown>, or specific types)
- Prefix unused callback args with underscore
- Fix unescaped JSX entities
- Lint now passes cleanly (0 errors, 2 intentional img warnings)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 12:06:18 +01:00
67d7e6e3d5 Initial commit: Port Nimara CRM (Layers 0-4)
Some checks failed
Build & Push Docker Images / build-and-push (push) Has been cancelled
Build & Push Docker Images / deploy (push) Has been cancelled
Build & Push Docker Images / lint (push) Has been cancelled
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00