deployment-plan.md gains a full env-var reference (CRM + website) and the cutover env-flip sequence; launch-readiness.md gets the 2026-06-02 closeout; BACKLOG.md adds the deferred integration-health-panel idea (section L).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Ship-what's-done prep ahead of the prod cutover (launch ~today):
- Hide Financial + Marketing report cards from the reports landing
(both were "Builder in development" placeholders gated on unbuilt
data sources). Sales/Operational/Custom + templates/scheduling/
exports remain live.
- Trim the Custom-report card copy to match the shipped basic builder
(no group-by/filters yet; the builder page header was already honest).
- Hide the Bulk Import mockup from search-nav-catalog + the admin
sections browser; /admin/import is now unreachable from the UI.
- Correct client-facing doc over-claims (waiting-list "next-in-line
notification", Import) in features-list.md + new-system-feature-summary.md.
- Un-stale BACKLOG.md (Documenso phases 2-7 confirmed shipped).
- Log decisions + deferred work (full importer, full custom-builder,
waiting-list, maintenance-log, paper-upload bug) to launch-readiness.md.
Deferred-importer design spec added at
docs/superpowers/specs/2026-06-01-bulk-import-design.md.
Verified: tsc --noEmit clean, eslint clean on changed files,
1512/1519 vitest pass (7 failures are Redis-down, unrelated).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>