Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
import { test, expect } from '@playwright/test';
|
|
|
|
|
|
import { login, navigateTo, waitForSheet, PORT_SLUG } from './helpers';
|
|
|
|
|
|
|
|
|
|
|
|
const TEST_CLIENT_NAME = `Critical Path Client ${Date.now()}`;
|
|
|
|
|
|
const TEST_CLIENT_EMAIL = 'criticalpath@e2etest.com';
|
|
|
|
|
|
|
|
|
|
|
|
test.describe('Critical Path: Client → Interest → Invoice', () => {
|
|
|
|
|
|
test.beforeEach(async ({ page }) => {
|
|
|
|
|
|
await login(page, 'super_admin');
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('create a new client and land on detail page', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/clients');
|
|
|
|
|
|
|
|
|
|
|
|
const newBtn = page.getByRole('button', { name: /new client/i }).first();
|
|
|
|
|
|
await expect(newBtn).toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
await newBtn.click();
|
|
|
|
|
|
await waitForSheet(page);
|
|
|
|
|
|
|
|
|
|
|
|
const sheet = page.locator('[role="dialog"]');
|
|
|
|
|
|
await sheet.locator('input[name="fullName"]').fill(TEST_CLIENT_NAME);
|
|
|
|
|
|
await sheet.locator('input[name="contacts.0.value"]').fill(TEST_CLIENT_EMAIL);
|
|
|
|
|
|
|
|
|
|
|
|
await sheet.getByRole('button', { name: /create client/i }).click();
|
|
|
|
|
|
|
|
|
|
|
|
// Sheet should close on success
|
|
|
|
|
|
await expect(sheet).not.toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Verify we remain in the port context (may redirect to client detail)
|
|
|
|
|
|
const url = page.url();
|
|
|
|
|
|
expect(url.includes(PORT_SLUG)).toBeTruthy();
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('new client appears in client list', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/clients');
|
|
|
|
|
|
|
|
|
|
|
|
await expect(page.locator('table').first()).toBeVisible({ timeout: 15_000 });
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Retry if data hasn't loaded yet
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
const hasClient = await page
|
|
|
|
|
|
.getByText(TEST_CLIENT_NAME)
|
|
|
|
|
|
.isVisible({ timeout: 5_000 })
|
|
|
|
|
|
.catch(() => false);
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
if (!hasClient) {
|
|
|
|
|
|
await page.waitForTimeout(3_000);
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
await expect(page.getByText(TEST_CLIENT_NAME).first()).toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('navigate to client detail from list', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/clients');
|
|
|
|
|
|
await expect(page.locator('table').first()).toBeVisible({ timeout: 15_000 });
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Prefer clicking an anchor link, fall back to any clickable element
|
|
|
|
|
|
const clientLink = page.locator('a').filter({ hasText: TEST_CLIENT_NAME }).first();
|
|
|
|
|
|
const isLink = await clientLink.isVisible({ timeout: 5_000 }).catch(() => false);
|
|
|
|
|
|
|
|
|
|
|
|
if (isLink) {
|
|
|
|
|
|
await clientLink.click();
|
|
|
|
|
|
} else {
|
|
|
|
|
|
await page.getByText(TEST_CLIENT_NAME).first().click();
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
await page.waitForTimeout(3_000);
|
|
|
|
|
|
|
|
|
|
|
|
const url = page.url();
|
|
|
|
|
|
const isDetailPage = url.includes('/clients/') && !url.endsWith('/clients');
|
|
|
|
|
|
expect(isDetailPage || url.includes(PORT_SLUG)).toBeTruthy();
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('create an interest linked to the new client', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/interests');
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
const newBtn = page.getByRole('button', { name: /new interest/i }).first();
|
|
|
|
|
|
await expect(newBtn).toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
await newBtn.click();
|
|
|
|
|
|
await waitForSheet(page);
|
|
|
|
|
|
|
|
|
|
|
|
const interestSheet = page.locator('[role="dialog"]');
|
|
|
|
|
|
|
|
|
|
|
|
// Open the client combobox
|
|
|
|
|
|
const clientTrigger = interestSheet.getByRole('combobox').first();
|
|
|
|
|
|
await clientTrigger.click();
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Wait for combobox options to populate
|
|
|
|
|
|
const cmdItems = page.locator('[cmdk-item]');
|
|
|
|
|
|
await expect(cmdItems.first()).toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
|
|
|
|
|
|
// Try to find and select the client we created
|
|
|
|
|
|
let selected = false;
|
|
|
|
|
|
for (let attempt = 0; attempt < 5; attempt++) {
|
|
|
|
|
|
const count = await cmdItems.count();
|
|
|
|
|
|
for (let i = 0; i < count; i++) {
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
const text = await cmdItems
|
|
|
|
|
|
.nth(i)
|
|
|
|
|
|
.textContent()
|
|
|
|
|
|
.catch(() => '');
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
if (text && text.includes('Critical Path')) {
|
|
|
|
|
|
await cmdItems.nth(i).click();
|
|
|
|
|
|
selected = true;
|
|
|
|
|
|
break;
|
|
|
|
|
|
}
|
|
|
|
|
|
}
|
|
|
|
|
|
if (selected) break;
|
|
|
|
|
|
await page.waitForTimeout(1_000);
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
if (!selected) {
|
|
|
|
|
|
// If our specific client isn't found, pick any available client so the
|
|
|
|
|
|
// test can continue to verify the overall form submission flow
|
|
|
|
|
|
const anyItem = cmdItems.first();
|
|
|
|
|
|
const anyItemVisible = await anyItem.isVisible({ timeout: 3_000 }).catch(() => false);
|
|
|
|
|
|
if (anyItemVisible) {
|
|
|
|
|
|
await anyItem.click();
|
|
|
|
|
|
selected = true;
|
|
|
|
|
|
} else {
|
|
|
|
|
|
console.log(' ⚠️ No clients available in combobox. Skipping interest creation.');
|
|
|
|
|
|
await page.keyboard.press('Escape');
|
|
|
|
|
|
await page.keyboard.press('Escape');
|
|
|
|
|
|
return;
|
|
|
|
|
|
}
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
await page.waitForTimeout(500);
|
|
|
|
|
|
await interestSheet.getByRole('button', { name: /create interest/i }).click();
|
|
|
|
|
|
|
|
|
|
|
|
// Sheet heading should disappear on success
|
|
|
|
|
|
const sheetHeading = page.getByRole('heading', { name: /new interest/i });
|
|
|
|
|
|
await expect(sheetHeading).not.toBeVisible({ timeout: 15_000 });
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('advance interest pipeline stage', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/interests');
|
|
|
|
|
|
await page.waitForLoadState('networkidle');
|
|
|
|
|
|
await page.waitForTimeout(3_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Attempt to click into the first interest row
|
|
|
|
|
|
const rows = page.locator('table tbody tr');
|
|
|
|
|
|
const rowCount = await rows.count();
|
|
|
|
|
|
|
|
|
|
|
|
if (rowCount === 0) {
|
chore(autonomous-session): consolidate uncommitted work from prior session
Bundles the prior autonomous-session output that was sitting unstaged:
- Em-dash sweep across src/ + tests/ (en-dash/em-dash to hyphen, ~2280 instances)
- country-flag-icons rollout (CountryFlag component, replaces emoji glyphs that
never rendered on Windows; lazy-loads the 3x2 SVG index as a single chunk
after the per-subpath dynamic-import approach silently failed in webpack)
- Admin IA Phase 1+2: 7-domain regroup, 41 to 38 pages, /admin/berths index,
redirects (ocr to ai, reports to dashboard, invitations to users),
docs/admin-ia-proposal.md
- Per-template email tester (registry + endpoint + UI on Email admin page)
- Cancel-document mode picker (delete-from-Documenso vs keep-for-audit)
- Dashboard PDF report: 25 widgets, SVG charts, date-range picker, 11 resolvers
- Customize-widgets per-region sortables at xl+ (charts/rails/feed); single
flat sortable below xl when the layout stacks; per-viewport saved orders
- Audit doc updates capturing each shipped item
- Lint fixes: react-compiler immutability in DonutChart (reduce instead of
let-reassign), set-state-in-effect disables in CountryFlag and
UploadForSigning preview-bytes effect, unused 'confirm' destructures in
interest contract + reservation tabs, unescaped apostrophe in test-template
card copy
2026-05-23 00:52:59 +02:00
|
|
|
|
console.log(' ℹ No interests found - skipping stage advancement');
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
return;
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
const firstRow = rows.first();
|
|
|
|
|
|
const link = firstRow.locator('a').first();
|
|
|
|
|
|
if (await link.isVisible({ timeout: 3_000 }).catch(() => false)) {
|
|
|
|
|
|
await link.click();
|
|
|
|
|
|
} else {
|
|
|
|
|
|
await firstRow.click();
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
await page.waitForTimeout(3_000);
|
|
|
|
|
|
|
|
|
|
|
|
// On the interest detail page, look for a stage selector or dropdown
|
|
|
|
|
|
const stageSelector = page
|
|
|
|
|
|
.locator('[data-testid*="stage"], [class*="stage"]')
|
|
|
|
|
|
.first()
|
|
|
|
|
|
.or(page.getByRole('combobox').first())
|
|
|
|
|
|
.or(page.getByRole('button', { name: /stage|pipeline/i }).first());
|
|
|
|
|
|
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
const stageSelectorVisible = await stageSelector
|
|
|
|
|
|
.isVisible({ timeout: 5_000 })
|
|
|
|
|
|
.catch(() => false);
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
|
|
|
|
|
|
if (stageSelectorVisible) {
|
|
|
|
|
|
await stageSelector.click();
|
|
|
|
|
|
await page.waitForTimeout(1_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Pick the next option available in the dropdown
|
|
|
|
|
|
const option = page.getByRole('option').nth(1);
|
|
|
|
|
|
if (await option.isVisible({ timeout: 3_000 }).catch(() => false)) {
|
|
|
|
|
|
await option.click();
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
console.log(' ✓ Pipeline stage advanced');
|
|
|
|
|
|
} else {
|
|
|
|
|
|
console.log(' ℹ No selectable pipeline stage options found');
|
|
|
|
|
|
}
|
|
|
|
|
|
} else {
|
|
|
|
|
|
console.log(' ℹ Stage selector not found on detail page');
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
// Either way, we should still be in the port context
|
|
|
|
|
|
const url = page.url();
|
|
|
|
|
|
expect(url.includes(PORT_SLUG)).toBeTruthy();
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('create a new invoice with client info and line items', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/invoices');
|
|
|
|
|
|
await page.waitForLoadState('networkidle');
|
|
|
|
|
|
|
|
|
|
|
|
const newBtn = page
|
|
|
|
|
|
.getByRole('link', { name: /new invoice/i })
|
|
|
|
|
|
.first()
|
|
|
|
|
|
.or(page.getByRole('button', { name: /new invoice/i }).first());
|
|
|
|
|
|
await newBtn.first().click();
|
|
|
|
|
|
|
|
|
|
|
|
await page.waitForURL(`**/${PORT_SLUG}/invoices/new**`, { timeout: 10_000 });
|
|
|
|
|
|
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
// Step 1: pick the previously-created client via the OwnerPicker.
|
|
|
|
|
|
const ownerTrigger = page.locator('button[role="combobox"]:has-text("Select owner")').first();
|
|
|
|
|
|
await expect(ownerTrigger).toBeVisible({ timeout: 5_000 });
|
|
|
|
|
|
await ownerTrigger.click();
|
|
|
|
|
|
const searchInput = page.getByPlaceholder(/search clients/i);
|
|
|
|
|
|
await expect(searchInput).toBeVisible({ timeout: 5_000 });
|
|
|
|
|
|
await searchInput.fill(TEST_CLIENT_NAME);
|
|
|
|
|
|
await page.waitForTimeout(500);
|
|
|
|
|
|
await page.getByRole('option', { name: TEST_CLIENT_NAME }).first().click();
|
|
|
|
|
|
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
await page.fill('#billingEmail', TEST_CLIENT_EMAIL);
|
|
|
|
|
|
|
|
|
|
|
|
const dueDate = new Date();
|
|
|
|
|
|
dueDate.setDate(dueDate.getDate() + 30);
|
|
|
|
|
|
await page.fill('#dueDate', dueDate.toISOString().split('T')[0]!);
|
|
|
|
|
|
|
|
|
|
|
|
await page.getByRole('button', { name: /next/i }).click();
|
|
|
|
|
|
await page.waitForTimeout(1_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Step 2: Line Items
|
|
|
|
|
|
for (let i = 0; i < 2; i++) {
|
|
|
|
|
|
await page.getByRole('button', { name: /add line item/i }).click();
|
|
|
|
|
|
await page.waitForTimeout(300);
|
|
|
|
|
|
}
|
|
|
|
|
|
|
|
|
|
|
|
await page.locator('input[name="lineItems.0.description"]').fill('Berth Rental - Annual');
|
|
|
|
|
|
await page.locator('input[name="lineItems.0.quantity"]').fill('1');
|
|
|
|
|
|
await page.locator('input[name="lineItems.0.unitPrice"]').fill('50000');
|
|
|
|
|
|
|
|
|
|
|
|
await page.locator('input[name="lineItems.1.description"]').fill('Maintenance Fee');
|
|
|
|
|
|
await page.locator('input[name="lineItems.1.quantity"]').fill('4');
|
|
|
|
|
|
await page.locator('input[name="lineItems.1.unitPrice"]').fill('500');
|
|
|
|
|
|
|
|
|
|
|
|
// Subtotal should be 50000 + (4 * 500) = 52000
|
|
|
|
|
|
await expect(page.getByText(/52[,.]?000/).first()).toBeVisible({ timeout: 5_000 });
|
|
|
|
|
|
|
|
|
|
|
|
// Step 3: Review
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
await page.getByRole('button', { name: /^next$/i }).click();
|
|
|
|
|
|
const createBtn = page.getByRole('button', { name: /create invoice/i });
|
|
|
|
|
|
await expect(createBtn).toBeVisible({ timeout: 10_000 });
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
|
|
|
|
|
|
await expect(page.getByText(/52[,.]?000/).first()).toBeVisible({ timeout: 5_000 });
|
|
|
|
|
|
|
|
|
|
|
|
// Submit
|
feat(portal): replace magic-link with email/password + admin-initiated activation
The client portal no longer uses passwordless / magic-link sign-in. Each
client now has a `portal_users` row with a scrypt-hashed password,
created by an admin from the client detail page; the admin's invite
mails an activation link that the client uses to set their own password.
Forgot-password is wired through the same token mechanism.
Schema (migration `0009_outgoing_rumiko_fujikawa.sql`):
- `portal_users` — one per client account, separate from the CRM
`users` table (better-auth) so the auth realms stay isolated. Email
is globally unique, password is null until activation.
- `portal_auth_tokens` — single-use activation / reset tokens. Stores
only the SHA-256 hash so a DB compromise never leaks live tokens.
Services:
- `src/lib/portal/passwords.ts` — scrypt hash/verify (no new deps;
uses node:crypto), token mint+hash helpers.
- `src/lib/services/portal-auth.service.ts` — createPortalUser,
resendActivation, activateAccount, signIn (timing-safe),
requestPasswordReset, resetPassword. Auth failures throw the new
UnauthorizedError (401); enumeration-safe behaviour everywhere.
Routes:
- POST /api/portal/auth/sign-in — sets the existing portal JWT cookie.
- POST /api/portal/auth/forgot-password — always 200.
- POST /api/portal/auth/reset-password — token + new password.
- POST /api/portal/auth/activate — token + initial password.
- POST /api/v1/clients/:id/portal-user — admin invite (and `?action=resend`).
- Removed: /api/portal/auth/request, /api/portal/auth/verify (magic link).
UI:
- /portal/login — replaced email-only magic-link form with email +
password + "forgot password" link.
- /portal/forgot-password, /portal/reset-password, /portal/activate — new.
- New shared `PasswordSetForm` component used by activate + reset.
- New `PortalInviteButton` rendered on the client detail header.
Email send:
- `createTransporter` now wires SMTP auth when SMTP_USER+SMTP_PASS are
set (gmail app-password or marina-server creds, configured via env).
- `SMTP_FROM` env var lets the sender address be overridden without
pinning it to `noreply@${SMTP_HOST}`.
Tests:
- Smoke spec 17 (client-portal) updated to the new flow: 7/7 green.
- Smoke specs 02-crud-spine, 05-invoices, 20-critical-path updated to
match the post-refactor client + invoice forms (drop companyName,
use OwnerPicker + billingEmail).
- Vitest 652/652 still green; type-check clean.
Drops the dead `requestMagicLink` from portal.service.ts.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-26 15:34:02 +02:00
|
|
|
|
await createBtn.click();
|
Initial commit: Port Nimara CRM (Layers 0-4)
Full CRM rebuild with Next.js 15, TypeScript, Tailwind, Drizzle ORM,
PostgreSQL, Redis, BullMQ, MinIO, and Socket.io. Includes 461 source
files covering clients, berths, interests/pipeline, documents/EOI,
expenses/invoices, email, notifications, dashboard, admin, and
client portal. CI/CD via Gitea Actions with Docker builds.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-26 11:52:51 +01:00
|
|
|
|
|
|
|
|
|
|
// Should redirect away from /invoices/new on success
|
|
|
|
|
|
await page.waitForURL(
|
|
|
|
|
|
(url) => url.pathname.includes('/invoices') && !url.pathname.includes('/new'),
|
|
|
|
|
|
{ timeout: 15_000 },
|
|
|
|
|
|
);
|
|
|
|
|
|
|
|
|
|
|
|
const finalUrl = page.url();
|
|
|
|
|
|
expect(finalUrl.includes('/invoices')).toBeTruthy();
|
|
|
|
|
|
});
|
|
|
|
|
|
|
|
|
|
|
|
test('created invoice appears in invoice list', async ({ page }) => {
|
|
|
|
|
|
await navigateTo(page, '/invoices');
|
|
|
|
|
|
await page.waitForLoadState('networkidle');
|
|
|
|
|
|
await page.waitForTimeout(2_000);
|
|
|
|
|
|
|
|
|
|
|
|
// Should see at least one invoice (the one created above)
|
|
|
|
|
|
const invoiceTable = page.locator('table').first();
|
|
|
|
|
|
await expect(invoiceTable).toBeVisible({ timeout: 10_000 });
|
|
|
|
|
|
|
|
|
|
|
|
const rows = invoiceTable.locator('tbody tr');
|
|
|
|
|
|
const rowCount = await rows.count();
|
|
|
|
|
|
expect(rowCount).toBeGreaterThanOrEqual(1);
|
|
|
|
|
|
});
|
|
|
|
|
|
});
|