MOPC-App/docs/round-redesign-architecture.../mixed-round-design-implemen.../phase-06-platform-dependenc...
Matt 331b67dae0
Build and Push Docker Image / build (push) Successful in 19m31s Details
Round system redesign: Phases 1-7 complete
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00
..
acceptance-gates.md Round system redesign: Phases 1-7 complete 2026-02-13 13:57:09 +01:00
module-refit-map.md Round system redesign: Phases 1-7 complete 2026-02-13 13:57:09 +01:00
overview.md Round system redesign: Phases 1-7 complete 2026-02-13 13:57:09 +01:00
symbol-sweep-checklist.md Round system redesign: Phases 1-7 complete 2026-02-13 13:57:09 +01:00
tasks.md Round system redesign: Phases 1-7 complete 2026-02-13 13:57:09 +01:00