Commit Graph

4 Commits

Author SHA1 Message Date
Matt 7f334ed095 Round detail overhaul, file requirements, project management, audit log fix
- Redesign round detail page with 6 tabs (overview, projects, filtering, assignments, config, documents)
- Add jury group assignment selector in round stats bar
- Add FileRequirementsEditor component replacing SubmissionWindowManager
- Add FilteringDashboard component for AI-powered project screening
- Add project removal from rounds (single + bulk) with cascading to subsequent rounds
- Add project add/remove UI in ProjectStatesTable with confirmation dialogs
- Fix logAudit inside $transaction pattern across all 12 router files
  (PostgreSQL aborted-transaction state caused silent operation failures)
- Fix special awards creation, deletion, status update, and winner assignment

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-16 07:49:39 +01:00
Matt 6ca39c976b Competition/Round architecture: full platform rewrite (Phases 1-9)
Replace Pipeline/Stage system with Competition/Round architecture.
New schema: Competition, Round (7 types), JuryGroup, AssignmentPolicy,
ProjectRoundState, DeliberationSession, ResultLock, SubmissionWindow.
New services: round-engine, round-assignment, deliberation, result-lock,
submission-manager, competition-context, ai-prompt-guard.
Full admin/jury/applicant/mentor UI rewrite. AI prompt hardening with
structured prompts, retry logic, and injection detection. All legacy
pipeline/stage code removed. 4 new migrations + seed aligned.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-15 23:04:15 +01:00
Matt b5425e705e Apply full refactor updates plus pipeline/email UX confirmations 2026-02-14 15:26:42 +01:00
Matt 331b67dae0 Round system redesign: Phases 1-7 complete
Build and Push Docker Image / build (push) Successful in 19m31s Details
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00