Build and Push Docker Image / build (push) Successful in 14m19sDetails
- Implement background job system for AI filtering to avoid HTTP timeouts
- Add FilteringJob model to track progress of long-running filtering operations
- Add real-time progress polling for filtering operations on round details page
- Create custom DateTimePicker component with calendar popup (no year picker hassle)
- Fix round date persistence bug (refetchOnWindowFocus was resetting form state)
- Integrate filtering controls into round details page for filtering rounds
- Display AI reasoning for flagged/filtered projects in results table
- Add onboarding system scaffolding (schema, routes, basic UI)
- Allow setting round dates in the past for manual overrides
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Build and Push Docker Image / build (push) Successful in 8m16sDetails
Projects now exist at the program level instead of being locked to a
single round. A new RoundProject join table enables many-to-many
relationships with per-round status tracking. Rounds have sortOrder
for configurable progression paths.
- Add RoundProject model, programId on Project, sortOrder on Round
- Migration preserves existing data (roundId -> RoundProject entries)
- Update all routers to query through RoundProject join
- Add assign/remove/advance/reorder round endpoints
- Add Assign, Advance, Remove Projects dialogs on round detail page
- Add round reorder controls (up/down arrows) on rounds list
- Show all rounds on project detail page
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Build and Push Docker Image / build (push) Successful in 8m33sDetails
Change program selectors and display labels from full program name
to "2026 Edition" format across admin, jury, mentor, observer, and
public pages. Selector labels changed from "Program" to "Edition".
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Build and Push Docker Image / build (push) Failing after 10sDetails
Full Next.js 15 platform with tRPC, Prisma, PostgreSQL, NextAuth.
Includes production Dockerfile (multi-stage, port 7600), docker-compose
with registry-based image pull, Gitea Actions CI workflow, nginx config
for portal.monaco-opc.com, deployment scripts, and DEPLOYMENT.md guide.
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>