2026-02-14 15:26:42 +01:00
|
|
|
# Release Evidence Report Template
|
|
|
|
|
|
|
|
|
|
## Build Metadata
|
|
|
|
|
|
|
|
|
|
- Date:
|
|
|
|
|
- Commit SHA:
|
|
|
|
|
- Environment:
|
|
|
|
|
- Operator:
|
|
|
|
|
|
|
|
|
|
## Phase Completion Summary
|
|
|
|
|
|
|
|
|
|
- Phase 00:
|
|
|
|
|
- Phase 01:
|
|
|
|
|
- Phase 02:
|
|
|
|
|
- Phase 03:
|
|
|
|
|
- Phase 04:
|
|
|
|
|
- Phase 05:
|
|
|
|
|
- Phase 06:
|
|
|
|
|
- Phase 07:
|
|
|
|
|
|
|
|
|
|
## Test Summary
|
|
|
|
|
|
|
|
|
|
- Unit: pass/fail counts
|
|
|
|
|
- Integration: pass/fail counts
|
|
|
|
|
- E2E: pass/fail counts
|
|
|
|
|
- Performance: pass/fail counts
|
|
|
|
|
|
|
|
|
|
## Mandatory Scenario Results
|
|
|
|
|
|
|
|
|
|
| ID | Result | Evidence Link | Notes |
|
|
|
|
|
|---|---|---|---|
|
|
|
|
|
| E-001 | | | |
|
|
|
|
|
| E-002 | | | |
|
|
|
|
|
| E-003 | | | |
|
|
|
|
|
| E-004 | | | |
|
|
|
|
|
| E-005 | | | |
|
|
|
|
|
| E-006 | | | |
|
|
|
|
|
| E-007 | | | |
|
|
|
|
|
| E-008 | | | |
|
|
|
|
|
|
|
|
|
|
## Performance Results
|
|
|
|
|
|
|
|
|
|
| ID | Result | Evidence Link | Notes |
|
|
|
|
|
|---|---|---|---|
|
|
|
|
|
| P-001 | | | |
|
|
|
|
|
| P-002 | | | |
|
|
|
|
|
| P-003 | | | |
|
|
|
|
|
| P-004 | | | |
|
|
|
|
|
|
|
|
|
|
## Legacy Sweep Results
|
|
|
|
|
|
|
|
|
|
- `trpc.round` references:
|
|
|
|
|
- `roundId` orchestration references:
|
|
|
|
|
- `round.settingsJson` behavior references:
|
|
|
|
|
- schema `Round` references:
|
|
|
|
|
|
|
|
|
|
## Known Issues
|
|
|
|
|
|
|
|
|
|
- None / list with severity and owner
|
|
|
|
|
|
|
|
|
|
## Sign-Off
|
|
|
|
|
|
|
|
|
|
- Engineering:
|
|
|
|
|
- Product:
|
|
|
|
|
- Operations:
|